This was a project to create a wet weather shelter for a primary school.   This was similar to the one Mervyn built for St Mary’s Banbury but this one had a larger floor area and an added lockable shed for sports equipment.  A design challenge was the sloping site and an overhanging tree with a Preservation Order.  Verdict:  great success with the pupils who love using it as a playden in wet weather and fine.shelter1shelter2

shelter3

Advertisements